Frequently Asked Questions

Short answers to common questions about restaurant, cafe, commercial and home projects with BOAS Construction, an interior design and construction studio in Port Coquitlam, BC since 2011.

These are the questions we hear most often. Where an answer covers permits or health approval, we quote the official municipal or health authority page and the date we checked it. This is general information only: we confirm the requirements with the municipality or health authority for each project.

For more detail, see restaurant and cafe renovation and home renovation, or contact us with your question.

Questions and answers

How long does a restaurant or cafe renovation take in Metro Vancouver?

The permit stage alone has published times in some cities: the City of Surrey reports a current processing time of 3.4 weeks for new tenant improvement building permits, against an established target of 10 weeks (last updated November 16, 2026). The City of Vancouver reports a median elapsed time of 4.4 weeks for lower-complexity commercial and mixed-use renovation permits issued in October 2026. Design and construction time is extra. This is general information; timelines are confirmed with the municipality for each project.

Do I need a building permit for a tenant improvement in Coquitlam, Burnaby or Vancouver?

Yes, all three cities state that tenant improvements generally need a permit. Coquitlam: you need a Tenant Improvement Permit for any new construction or proposed alteration of an existing building. Burnaby: interior or exterior alterations or changes of use to an existing commercial building, including tenant improvements, require a building permit. Vancouver lists renovating or tenant improvements for a commercial space as work that generally needs a permit. City pages checked November 20, 2026. This is general information; requirements are confirmed with the municipality for each project.

What does a new restaurant kitchen need to pass a health inspection?

It needs health authority approval of its floor plans before construction starts, and an inspection once it is built. Vancouver Coastal Health states floor plans must be approved by VCH before construction begins, and an Environmental Health Officer inspects whether construction matches the approved plan (page checked November 20, 2026). Fraser Health (page last updated December 5, 2025) asks for three sets of floor plans drawn to scale, a food safety plan and a sanitation plan. This is general information; requirements are confirmed with the health authority for each project.

Do you handle both design and construction?

Yes, we provide both interior design and construction. Design services include design plans, purchasing, installation and decorating, and clients who want to be involved can collaborate through the whole design process. For the construction phase, we provide the plans, drawings and schedules needed to build the project. The millwork team also designs, manufactures and installs custom cabinets.

Which cities do you serve?

We have completed projects in Vancouver, North Vancouver, West Vancouver, Burnaby, Richmond, Coquitlam, Port Coquitlam, Port Moody, Pitt Meadows, Maple Ridge, Surrey, Langley, Delta, Tsawwassen and Abbotsford, based on the projects shown on this website. Our studio is located at #2145 - 950 Seaborne Ave., Port Coquitlam, BC. Restaurant, cafe, salon, clinic, office and home projects are listed in the commercial, residential and industrial portfolios.

Can I get a consultation in Korean?

Yes, we have a Korean-language phone line: (778) 896-4001. The English line is (604) 355-0520, and you can also email info@boasconstruction.com or send a message through the contact page. A Korean-language page with project examples and contact details is available at /ko.

What happens between the first call and opening day?

The work starts with a consultation, moves to design, and then to the plans, drawings and schedules for the construction phase, through to the finishing touches. For homes the first consultation is a complimentary in-home consultation, and clients can visit vendors' showrooms to select materials. For custom millwork the steps are free consultation, creative design, cabinet manufacturing, and delivery and installation.

Start a projectEnglish (604) 355-0520Korean (778) 896-4001Contact form